The Connector
The Connector

July 7

5:19 a.m. — There was a power outage at the main campus for a brief moment. All systems came back online except for the C building elevators. Elevators were reset, however one elevator still did not return to service. A call was made to service the elevator.

July 11

3:56 — Security found both gates to the 1611 W. Peachtree St. building open. Supervisor checked the exterior and found no problems. Gates were closed.

July 12

9:28 p.m. — Security found a water leak on the fifth floor C building of the main campus. Water was coming down onto a piece of artwork. On-call engineer was notified of the leak and the artwork was removed from the wall.

9:28 p.m. — Security was informed that a water leak was dripping into the main lobby at Spring House. A cleaner was on site and placed a “wet floor” sign out, then mopped up the standing water. A bucket was left to catch further drips.

July 13

1:38 a.m. — Security was informed by two students that the back gate to Spring House was not working and remained locked when they were using their badge cards. Maintenance was notified and will investigate.