Monday, September 20, and Tuesday, September 21, the breezeway between the main campus building and the parking deck will be closed due to construction. You will be able to enter the parking deck as normal. However upon exiting, you will not be able to turn right into the breezeway. You will be directed to the Peachtree Street exit. To access SCAD Way from the parking deck, you will need to exit via the Peachtree Street exit and re-enter the main SCAD Atlanta driveway.
SCAD shuttle service will continue to operate as normally scheduled—picking up and delivering passengers at the end of the south side of the breezeway near the stop sign next to the main building.